๐Ÿ”’ Strict IP Protection & Data Securityโœˆ๏ธ AS9100 & IATF 16949 Standardsโšก 100% Manufactured in South Korea ยท Express Delivery

Turnkey PCB assembly ยท South Korea

Turnkey PCB assembly in Korea, from BOM to tested boards

Stop coordinating a fab house, a parts broker and an assembly shop across three time zones. NexTurn PCB sources components, fabricates the board and runs SMT assembly in one Korean flow โ€” including quick-turn PCBA builds for hardware teams that need a working prototype before the next design review.

  • Sourcing + fabrication + SMT in one quote
  • Turnkey, partial or consigned
  • Quick-turn prototype builds
  • Encrypted file handling

Turnkey, partial turnkey or consigned

Pick the sourcing model that matches your parts strategy โ€” the manufacturing flow stays the same.

ModelWho buys the componentsBest for
TurnkeyNexTurn sources the full BOMTeams without a procurement function, or who want one invoice and one owner
Partial turnkeyYou consign critical parts, we source the restLong-lead MCUs, RF modules, customer-specified or allocated parts
ConsignedYou ship the full kitTeams with existing stock or franchised distributor contracts

How a turnkey build runs

Five steps, one engineering contact.

1. Data package review

Gerber or ODB++, BOM with manufacturer part numbers, and pick-and-place. We flag anything missing before quoting rather than after.

2. DFM review โ€” 1โ€“3 business days

Manufacturability findings come back in writing with the affected nets, pads and clearances, plus proposed fixes.

3. Component sourcing

Parts are bought against your BOM; at-risk lines get alternate proposals with datasheets for your approval โ€” never a silent substitution.

4. Fabrication and SMT

Board fabrication, stencil, SMT and IMT assembly. 0402 standard with 0201 capability available.

5. Inspection and shipment

AOI, X-ray for BGA and hidden joints, plus electrical or functional test where specified. Reports ship with the boards.

Quotes within 2 business days

Complete packages are quoted in two business days, with a target turnaround stated per build.

What to send for a quick-turn PCBA quote

A complete package is the single biggest factor in how fast a quick-turn build actually moves.

FileFormatWhy it matters
Fabrication dataGerber RS-274X or ODB++Drives layer count, stack-up and finish pricing
BOMXLS/CSV with MPN and quantitySourcing cannot start on generic descriptions
Pick and placeXY centroid with rotationRequired for SMT programming
Assembly drawingPDFPolarity, orientation and special handling notes
Test requirementsNotes or test planDetermines whether ICT/FCT is in the quote

Frequently asked questions